Meeting Date
2025-01-07
Board
Present
Chris Smith, Jeff Rackliff, Laura Church, Kerry Casey
  1. Reviewed and dispersed the mail.
  2. The selectmen read and accepted the minutes from the previous meeting.
  3. Reviewed and signed Warrant # 25 ($19,274.91).
  4. The select board discussed the heat pump installation and it has been awarded to Fitch Heating.
  5. Reviewed and signed Warrant # 01 ($101,273.46).
  6. The Townhouse exterior light will be replaced with a dusk to dawn LED light.
  7. The electric box at the firestation will need to upgrade to a 200 amp service.
  8. The culvert on the Mason Road will need to be replaced as it is allowing water to run across the road and is causing damage.
  9. The select board started to review the 2025 Town Warrant.
  10. Reviewed and signed Vienna Broadband Warrant# 9 ($9,605.00).
  11. Meeting adjourned.